Warning: Parameter 1 to wp_default_scripts() expected to be a reference, value given in /www/htdocs/w00cfc41/blog/wordpress/wp-includes/plugin.php on line 580
Work, work, work… « Rabenschwinges Cavern blog

Work, work, work…

The last days we were really busy. First, we carved out two more rooms in Afelahn – everything is going as planned, and I´m happy to see the advancements. These rooms will be a storage room, and lab II, (lab I has yet to be done) when my “home base” will be ready.

With the help of my toosha, Tubby, we brought a heavy metal door to the age. Tom Woods, Shane Kennett and a bunch of guys with muscles managed to build it into the opening between the “garage” and the cave, so that the inner area is now secured against at least the strongest wind.

Shane told me, he would insulate the rooms when they are ready and that he had found a sprayer with some kind of D’ni material (stone?) that had been used by them for that purpose.

In Ahnoto, we have anchored a boat – a bigger, wooden one, not an inflatable – at the link in spot. It will stay there for the moment, so that we can bring material there, when we have time for that.

B.P. updated us about the Resehren books at the last meeting. They´ve found 23 of them. Unfortunately, four of them ceased to work, out of unknown reasons – maybe the descriptive books have been destroyed.
The other ones link to different ages and locations – 9 ages and 7 city locations altogether (some of the books link to the same places as others).
At the moment, we don´t have the personnel, nor the time to explore this new places, though we really would love to.
B.P. hinted, that he is actually trying to recruit more people for the expedition.

Leave a Reply

Why ask?

XHTML: You can use these tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>